Softy, Inc. manufactures teddy bears and dolls. Currently, Softy makes 2,000 teddy bears each month. Each teddy bear uses $2.00 in direct materials and $0.50 in direct labor. Softy uses two activities in manufacturing the teddy bears: Sewing and Processing. The total cost associated with Sewing (for both bears and dolls) is $15,000 a month, allocated on the basis of direct labor hours. The total cost associated with Processing is $10,000 a month, allocated on the basis of batches.

What is the total manufacturing cost for one teddy bear?

A. $2.50

B. $4.50

C. $7.00

D. $8.00